nitro450exp
(.333 member)
22/10/12 11:24 PM
Re: 20 ga DR build progress.

Update 10/22/12

Well the progress continues.

The sights are done, both sets, traditional with night sight and fibre.











The front sight base is stippled.



The chamber designation on the flats hase beed changed from 16/70 to 20/76.







Ready for blueing.

Thanks Nitro



Contact Us NitroExpress.com

Powered by UBB.threads™ 6.5.5


Home | Ezine | Forums | Links | Contact


Copyright 2003 to 2011 - all rights reserved