|
|
|||||||
Update 3/2/2011 Well finally I have some good progress news and pictures. Pic 1, DOM tube that the concave ribs were cut from. Pic 2, 1/4 rib being made. Pic 3, Monobloc being tapped. Pic 4, Barrels soldered in and contoured, Greener crossbolt tang area prepped for 1/4 rib. Pic 5, Front sight base on concave rib. Pic 6, Barrel assembly getting ready to be joined. We are getting closer, really getting excited now. Thanks Nitro |