headoftheholler
(.275 member)
15/01/14 12:40 PM
Re: Project Custom Mannlicher Mauser begins

Front sling post, rear sling stud and hood for front sight came in and installed.
Still waiting on bottom metal at local engraver, still have to bed stock and checker.





Contact Us NitroExpress.com

Powered by UBB.threads™ 6.5.5


Home | Ezine | Forums | Links | Contact


Copyright 2003 to 2011 - all rights reserved