|
|
|||||||
No, but it was my second call if the first went sour. I have commissioned a Heym 500/416NE 88B Safari. My preference had been for the side lock but the factory could not complete the side lock build within my time allowance, so I settled on the box lock. Delivery due 20 March... Day before my 73 birthday 😀 |